| 1 | [The introduction of the double bundle refrigerator] We introduce the refrigerator to make good use of exhaust heat, and to make warm water and operate from October, 2006. As a result, we were able to largely reduce consumption of LPG used for warm water production with 2,198t-CO2/ year. |
![]() |
| 2 | [The profit materials of the flammable waste oil] We separated the various kinds of waste oil drained from manufacturing process and recycled thermal as fuel. We remodeled the plant and established the outlet according to waste oil and, in addition, installed an exclusive tank and separated it and collected it. As a result, it came to cut it in sale and material recycle and was able to reduce waste discharge and CO2 discharges. |
![]() |


