Murata Mfg. Ltd. "Crisis task force" collects information and discusses what action should be taken. For early recovery, we will strive to support our employees and their families, and dispatch personnel to the field.
We inform you of the struck situation at the time of of Monday, 14th 15:00 as follows. The employee left worksite and operation has been stopped. We will inform you of it as soon as the restoration situation is confirmed. There is no tsunami damage. Other places are scheduled to do business usually.
Tome Murata Manufacturing Co., Ltd.
| Address | 11-1, Nakae 4-chome, Sanuma, Hasama-cho, Tome-shi, Miyagi 987-0511 Japan |
|---|---|
| Products | Wire Wound Type EMI Suppression Filters, Coils Target item list (PDF: 115KB) |
| Damage situation | There is no personal suffering. Damage is seen partially in the building and partially of equipment. Details of the struck situation are continuously being confirmed. The lifeline of electricity, water and the gas is out of service now, and we will inform you of the prospect of restoration as soon as it confirmed. |
Kanazawa Murata Manufacturing Co., Ltd. Sendai Plant
| Address | 2-6, Akedori 3-chome, Izumi-ku, Sendai-shi, Miyagi 981-3206 Japan |
|---|---|
| Products | Piezoelectric Products and SAW filters |
| Damage situation | There is no personal suffering. There is no big damage to the building and equipment. The lifeline of electricity, water service, and the gas is out of service now, and we will inform you of the prospect of restoration as soon as it confirmed. |
Murata Manufacturing Co., Ltd. Oyama Plant
| Address | 1-480, Inuzuka, Oyama-shi, Tochigi 323-8678 Japan |
|---|---|
| Products | Polymer Capacitors |
| Damage situation | There is no personal suffering. There is no big damage of the building and equipment. Electricity is supplied, and we expect that operation can be restarted in a few days. |
About the restoration of three factories (The thirteenth report) April 6, 2011 (Wednesday)
About the restoration of three factories (The twelfth report) March 29, 2011 (Tuesday)
About the restoration of three factories (The eleventh report) March 28, 2011 (Monday)
About the damage situation of the Eastern Japan earthquake and planned blackouts (The tenth report) March 23, 2011 (Wednesday)
About the damage situation of the Eastern Japan earthquake and planned blackouts (The ninth report) March 22, 2011 (Tuesday)
About the damage situation of the Eastern Japan earthquake and planned blackouts (The eighth report) March 18, 2011 (Friday)
About the damage situation of the Eastern Japan earthquake and planned blackouts (The seventh report) March 17, 2011 (Thursday)
About the damage situation of the Eastern Japan earthquake and planned blackouts (The sixth report) March 16, 2011 (Wednesday)
About the damage situation of the Eastern Japan earthquake (The fifth report)
March 15, 2011 (Tuesday)
About the damage situation of the Eastern Japan earthquake (The third report)
March 13, 2011 (Sunday)
About the damage situation of the Eastern Japan earthquake (The second report)
March 12, 2011 (Saturday)
About the damage situation of the Eastern Japan earthquake (The first report)
March 11, 2011 (Friday)